The Challenges

( 3B + G + 21 + 2 Dublex + R ) Tower

The building design is based on 3 Basements, Ground Floor, 1st Floor
(Health Club and Swimming Pool)  and 21 Typical Residential Floor + 2 Duplex Floor, Roof and Upper Roof. The Residential Tower is containing 3 basement levels and ground floor for car parks to accommodate a total of  339 cars, also main entrance hall and service and main garbage room at ground floor.
The 1st floor consisting swimming pool, health club, sauna steam, shower with related rest room equipped gymnasium, terrace (open to sky) and umbrella, lounge chair hard and soft landscape.
21 typical floors containing 2 flats with 3 bed room and 6 flats with 2 bed room at each typical. Also all related service rooms, garbage chute and emergency staircases.
2 floors for Duplex flats containing 6 Duplex flats. Roof level consisting services rooms, water tanks, gas tanks, lift machines and window cleaning machines.

View Google Map

Project Description

Client:Al Fahad Holding
Location:Tecom – Plot No. C008 - 026